No 360 on mine. WHat they did here was to create 3 "variants", and each of those have a closed set of optionals.. In my case I got things I didn't want (heat pump) and didn't get other that I wanted such as the 360 or front camara..
My variant is called ULTRA, not sure if this is true everywhere..
Duration from Order to Uk Delivery - Your Experience?
Ordered on 30 March 2022 Dealer "guessed" at a September Delivery but still not been notified of a build date for the car has anyone any idea of what build dates are for orders placed around that time? Plus, what's the gap from build date to delivery?
Had my fortnightly email from the dealer today telling me they're pleased to update me on the progress, but production week is still TBC.
iV80 Brilliant Silver, Suite, Sunroof, Climate Plus, Assisted Drive, Comfort Seat, Family Pack Plus, rear side airbags, tow bar. Ordered second week of October 2021. Production week assigned 22nd Sep 2022, build week 44, delivered week 52. On ME 3.1.
We ordered 26 March and was advised 12 months, emailed the dealer a couple of weeks ago to check current situation, he thinks we are still on for March, (EST del was 2 march) or earlier if we are v lucky.
Ordered 26 March 22, Sportline 80, Graphite grey, Assisted Drive+, Infotainment Package+, Drive Sport+, Heat Pump. Zappi charger, delivered 17 Aug 22,
I received following message from my (Norwegian) distributor the other day (I have ordered an iv80x):
These days, work is under way to move cars that now stand as 22 models onto 23 models
Cars produced by week 36 will be considered 23 models. Manual process that takes some time and this will probably be completed no later than next week.
We have seen a large increase in capacity in recent months and the factory is currently at 80-90% of full capacity. The factory's plan is to be back in 100% production after the factory holiday in weeks 31-32.
Considering that production has varied between 30-40% of full capacity in the past year, we hope that much of the backlog will be absorbed during autumn and winter. As of today, most cars ordered before September 2021 have been awarded production week.
These days, work is under way to move cars that now stand as 22 models onto 23 models
Cars produced by week 36 will be considered 23 models. Manual process that takes some time and this will probably be completed no later than next week.
We have seen a large increase in capacity in recent months and the factory is currently at 80-90% of full capacity. The factory's plan is to be back in 100% production after the factory holiday in weeks 31-32.
Considering that production has varied between 30-40% of full capacity in the past year, we hope that much of the backlog will be absorbed during autumn and winter. As of today, most cars ordered before September 2021 have been awarded production week.
My dealer contact got back from holiday today and found I now have a build date! - Week 34, so around w/c 8th October (11 months from order). No comments on specification: assumed to be as ordered. We'll see...
Enyaq iV60 Loft 100kW Charging, Arc. Silver, Regulus 19", Heat Pump, Ass'd Drive Pack, Parking+, Drive Sport, Conv.+, Transport Pack
Order 2-11-21 - Built 22-08-22 - Collected 28-09-22 - Drive Fault 4-10-22 - Back to Dealer 18-10-22 - Fixed 17-11-22
Order 2-11-21 - Built 22-08-22 - Collected 28-09-22 - Drive Fault 4-10-22 - Back to Dealer 18-10-22 - Fixed 17-11-22
-
- Posts: 19
- Joined: Mon Jul 25, 2022 12:36 pm
Hi all, my first post here, although like many others, I have been reading the forum for quite a while. I'm very grateful for all the discussion and information. I've learned so much. Very excited to finally get a status 10 build week of 37, i.e. middle of September, so possible delivery middle of October. That would be 11 months for us. Better than some recent posts, but slower than some others. Hoping that, following the experience of some others here, that this is now the worst case scenario and the build week maybe brought forward. Fingers etc all crossed.
Enyaq iv60 ecosuite, 100kW charging, Heatpump, Parking plus, Assisted drive plus, Comfort plus, Drive sport, Climate plus, Light and view, Ordered 24.11.21 - private purchase.
-
- Posts: 5
- Joined: Thu Mar 24, 2022 4:15 pm
I was told my build week was 26 and when I contacted the dealer in week 28 for an update they said there was no change in status. At the end of last week (29) there is still no update so I assume this means it has not started production yet.
I read on one of the FB groups the factory has shut down for MY23 updates, also read on here that is later in the summer and also read there is a factory holiday shutdown in August. If all these are the same shutdown then hopefully it runs down the line soon otherwise if they are separate shutdowns/line updates who knows when it will actually start production.
Does anyone have an accurate summary of shutdowns and line updates?
Ordered mid October 2021 and having seen lots of lucky people getting theirs delivered recently when ordered around the same time, I was getting optimistic but not so much anymore...
I read on one of the FB groups the factory has shut down for MY23 updates, also read on here that is later in the summer and also read there is a factory holiday shutdown in August. If all these are the same shutdown then hopefully it runs down the line soon otherwise if they are separate shutdowns/line updates who knows when it will actually start production.
Does anyone have an accurate summary of shutdowns and line updates?
Ordered mid October 2021 and having seen lots of lucky people getting theirs delivered recently when ordered around the same time, I was getting optimistic but not so much anymore...
Enyaq iV 60 Loft, black magic, tow bar, panoramic sunroof, convenience basic, parking basic, climate Plus. Ordered October 2021.
Just heard today from the dealer that my car has been built and is in transit to the port of departure. That's only a few days short of 9 months from placing the order. Proof that iV 80's are rolling off the line and that a configuration with a lot of packs isn't necessarily a barrier to progress.
iV 80 Suite, Arctic Silver plus various packages. ME 3.1
Ordered late Oct 21 for delivery June 2022. Scheduled production now Week 29 (was previously late September). In transit 25 July 22. Delivered as ordered 17 August 22.
Ordered late Oct 21 for delivery June 2022. Scheduled production now Week 29 (was previously late September). In transit 25 July 22. Delivered as ordered 17 August 22.
-